Complete overhaul of the 150 tons refrigeration room that includes a energy recuperation system. This is a CO2 transcritic refrigeration system.
Complete renewal of the air conditioning systems, including the installation of controls that provide a level of comfort more suitable for building operations.
Design and installation of a 12-ton cold room. Complete warehouse ventilation.