sectors : Arena
  • The work will last for 13 months
  • Scale of the work is more than $900 000.00
  • Montreal, Québec
    • Complete overhaul of the 80 tons refrigeration room that includes a energy recuperation system

other Projects

MUHC - McGill University Health Center

Hospital consisting of more than one building, for a total of 10 storeys, requiring the installation of high-performance HVAC (heating, ventilation and air conditioning) systems, with high levels of filtration, allowing air to be treated up to a 100%

Major agrifood corporation

New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.

Cummins Diesel

Office air conditioning and carbon monoxide removal.