Complete renovation of the mechanical room and installation of an 80-ton critical-load refrigeration system.
Integration of a 100% energy recovery loop using a high-efficiency natural refrigerant (R-717).
Rehabilitation of a critical-load refrigeration system for an arena.
Project carried out in Montréal (Québec), representing an investment of over $900,000. The work involved a complete renovation of the mechanical room, including the installation of a critical-load refrigeration system designed to ensure performance, reliability, and energy efficiency in a sports environment.
Refrigeration system
Implementation of an 80-ton refrigeration system using ammonia (R-717) as the refrigerant, recognized for its high energy efficiency and low environmental impact.
Energy recovery
The system integrates an energy recovery loop allowing 100% recovery, optimizing energy use and reducing thermal losses associated with arena operations.