








Replacement of the building’s cooling towers. Air-lifted into place by a helicopter fitted out specifically for this type of work.
Filtration system and ventilation for an environment that needs to be free of inorganic materials.
Complete overhaul of the 150 tons refrigeration room that includes a energy recuperation system. This is a CO2 transcritic refrigeration system.