Complete renewal of the air conditioning systems, including the installation of controls that provide a level of comfort more suitable for building operations.
Installation of a new 71 tons amonia refrigeration system. Low amount of amonia for a total 168 lbs.
Filtration system and ventilation for an environment that needs to be free of inorganic materials.