sectors : Institutional
  • The work will last for 1 year and 7 months
  • Scale of the work is more than $1 400 000.00
  • St-Laurent, Quebec
    • New installation of several ventilation systems for the entire building
    • LEED-NC, v.1.0, Gold-certified building
    • The mechanical rooms contain eight (8) modular units as well as two (2) fresh air systems with a thermal heat recovery wheel
    • One of the units is 3.58 meters high
    • Distinctive features: special architecture, working at heights, ceilings with different angles
    • Technology: Adjustable-angle long-throw jet nozzle diffusers.

other Projects

CHUM - University of Montreal Hospital Centre

Phase 1 B-4 to B-1, and P1 to P5. Technical and mechanical work for phase 1 was carried out in the D Block, consisting of rooms for medical consultations, medical examinations, minor surgery and MRI scans, as well as parking areas.

Marcel-Larocque Arena

Complete overhaul of the 150 tons refrigeration room that includes a energy recuperation system. This is a CO2 transcritic refrigeration system.

Federale court

Complete renewal of the air conditioning systems, including the installation of controls that provide a level of comfort more suitable for building operations.

Facebook
LinkedIn