sectors : Food Processing and Warehouse
  • The work will last for 3 months
  • Scale of the work is more than $500 000.00
  • Drummondville, Quebec
    • Addition of (9) nine evaporator
    • Refrigeration for meat freezer
    • Optimisation of valves stations
    • Accelerated works requiring a ‘’Shut down’’
    • Hot gas defrost

     

other Projects

Caisse de dépôt et placement

Prestigious building with an air conditioning system featuring the latest technologies.

Pete Morin Arena

Complete overhaul of the 80 tons refrigeration room that includes a energy recuperation system.

St-Mary Hospital Center

Installation of a redundant 400 tons refrigeration unit.