sectors : Food Processing and Warehouse
  • The work will last for 3 months
  • Scale of the work is more than $500 000.00
  • Drummondville, Quebec
    • Addition of (9) nine evaporator
    • Refrigeration for meat freezer
    • Optimisation of valves stations
    • Accelerated works requiring a ‘’Shut down’’
    • Hot gas defrost

     