New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.
Cold room redevelopment; Casiloc modernization project. Parallel pack.
Installation of 63 Liebert evaporators for the new high-density server rooms.