sectors : Lab Works
  • The work will last for 4 months
  • Scale of the work is more than $440 000.00
  • Blainville, Quebec
    • Filtration system and ventilation for an environment that needs to be free of inorganic materials
    • Inorganic waste treatment plant
    • Design, supply, and instal of a 65,000 PCM filtration system with 52 inches industrial ducks
    • Also for this customer: multiple ventilation lab projects and specialized disposal systems with PVC, fiberglass or stainless pipes.

other Projects

Letendre College

Complete installation of an air conditioning system for classrooms.

Pfizer

Full ductwork for R&D labs. C building.

MUHC - McGill University Health Center

Hospital consisting of more than one building, for a total of 10 storeys, requiring the installation of high-performance HVAC (heating, ventilation and air conditioning) systems, with high levels of filtration, allowing air to be treated up to a 100%

Facebook
LinkedIn