New steel and metal surfaces’ treatment facility. ADF Group is a major producer of complex metal structure elements. This new facility will will allow the handling of oversized structural elements.
Characteristics
New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.
Phase 1 B-4 to B-1, and P1 to P5. Technical and mechanical work for phase 1 was carried out in the D Block, consisting of rooms for medical consultations, medical examinations, minor surgery and MRI scans, as well as parking areas.
New installation of several ventilation systems for the entire building. LEED-NC, v.1.0, Gold-certified building.