sectors : Lab Works
  • The work will last for 4 months
  • Scale of the work is more than $440 000.00
  • Blainville, Quebec
    • Filtration system and ventilation for an environment that needs to be free of inorganic materials
    • Inorganic waste treatment plant
    • Design, supply, and instal of a 65,000 PCM filtration system with 52 inches industrial ducks
    • Also for this customer: multiple ventilation lab projects and specialized disposal systems with PVC, fiberglass or stainless pipes.

other Projects

CHUM - University of Montreal Hospital Centre

Phase 1 B-4 to B-1, and P1 to P5. Technical and mechanical work for phase 1 was carried out in the D Block, consisting of rooms for medical consultations, medical examinations, minor surgery and MRI scans, as well as parking areas.

Marcel-Larocque Arena

Complete overhaul of the 150 tons refrigeration room that includes a energy recuperation system. This is a CO2 transcritic refrigeration system.

Olymel

Refrigeration for meat freezer.

Facebook
LinkedIn