sectors : Lab Works
  • The work will last for 3 months
  • Scale of the work is more than $250 000.00
  • Montreal, Quebec
    • Full ductwork for R&D labs. C building
    • Project planning was made to be sure that 90% of the work, including pressure test for ventilation ducks and thermal insulation, would be completed during the summer construction holidays (2 weeks)
    • Installation and delivery of HEPA filters, including DOP test and laboratory validation.

other Projects

Federale court

Complete renewal of the air conditioning systems, including the installation of controls that provide a level of comfort more suitable for building operations.

Stablex

Filtration system and ventilation for an environment that needs to be free of inorganic materials.

Complexe DesJardins

Replacement of the building’s cooling towers. Air-lifted into place by a helicopter fitted out specifically for this type of work.