sectors : Lab Works
  • The work will last for 3 months
  • Scale of the work is more than $250 000.00
  • Montreal, Quebec
    • Full ductwork for R&D labs. C building
    • Project planning was made to be sure that 90% of the work, including pressure test for ventilation ducks and thermal insulation, would be completed during the summer construction holidays (2 weeks)
    • Installation and delivery of HEPA filters, including DOP test and laboratory validation.

other Projects

1000 de la gauchetière

Complete installation of an air conditioning system for a 50-storey office tower, in addition to an artificial skating rink in the central atrium.

Du Boisé Library

New installation of several ventilation systems for the entire building. LEED-NC, v.1.0, Gold-certified building.

Stablex

Filtration system and ventilation for an environment that needs to be free of inorganic materials.