sectors : Institutional
  • The work will last for 10 months
  • Scale of the work is more than $2 850 000.00
  • Montreal, Quebec
    • Installation of helical branch fans
    • Ductwork designed for use in healthcare environment
    • Installation of three air handling units which have been hauled up by cranes over 10 floors and then lowered one floor below
    • Welded ductwork system in stainless tested through a special process. NC3 laboratories
    • « Bag in bag out » filtration system installation for the NC3 laboratory, which protects occupants from cross-contamination

other Projects

Federale court

Complete renewal of the air conditioning systems, including the installation of controls that provide a level of comfort more suitable for building operations.

Marcel-Larocque Arena

Complete overhaul of the 150 tons refrigeration room that includes a energy recuperation system. This is a CO2 transcritic refrigeration system.

Major agrifood corporation

New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.

Facebook
LinkedIn