sectors : Arena
  • The work will last for 13 months
  • Scale of the work is more than $900 000.00
  • Montreal, Québec
    • Complete overhaul of the 80 tons refrigeration room that includes a energy recuperation system

other Projects

Major agrifood corporation

New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.

CHUM - University of Montreal Hospital Centre

Phase 1 B-4 to B-1, and P1 to P5. Technical and mechanical work for phase 1 was carried out in the D Block, consisting of rooms for medical consultations, medical examinations, minor surgery and MRI scans, as well as parking areas.

MIT - Mohawk Internet Technologies / Verizon

Complete ventilation and air conditioning systems for server room.