New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.
Full ductwork for R&D labs. C building.
Office air conditioning and carbon monoxide removal.