sectors : Offices
  • The work will last for 6 months
  • Scale of the work is more than $950 000.00
  • Montreal, Quebec
    • Complete renewal of the air conditioning systems
    • Including the installation of controls that provide a level of comfort more suitable for building operations

other Projects

Ultima Foods

To increase the yogurt production, we installed additional ammonia compressors.

Major agrifood corporation

New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.

Ahuntsic Arena

Installation of a new 71 tons amonia refrigeration system. Low amount of amonia for a total 168 lbs.

Facebook
LinkedIn