New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.
Design and installation of a 12-ton cold room. Complete warehouse ventilation.
Complete overhaul of the 80 tons refrigeration room that includes a energy recuperation system.