Phase 1 B-4 to B-1, and P1 to P5. Technical and mechanical work for phase 1 was carried out in the D Block, consisting of rooms for medical consultations, medical examinations, minor surgery and MRI scans, as well as parking areas.
Installation of bifurcated axial fans specifically designed for hospital environments.
Complete renewal of the air conditioning systems, including the installation of controls that provide a level of comfort more suitable for building operations.