sectors : Food Processing and Warehouse
  • The work will last for 6 months
  • Scale of the work is more than $1 600 000.00
  • St-Laurent, Quebec
    • New warehouse with 384 tons of refrigeration
    • 40 evaporators with hot gas defrost cool the distribution center
    • The freezer is maintained at -18C and the rest is at 4 C.
    • The work with a evaporative condenser

other Projects

CHUM - University of Montreal Hospital Centre

Phase 1 B-4 to B-1, and P1 to P5. Technical and mechanical work for phase 1 was carried out in the D Block, consisting of rooms for medical consultations, medical examinations, minor surgery and MRI scans, as well as parking areas.

CHU Sainte-Justine

Installation of bifurcated axial fans specifically designed for hospital environments.

Federale court

Complete renewal of the air conditioning systems, including the installation of controls that provide a level of comfort more suitable for building operations.