New installation of several ventilation systems for the entire building. LEED-NC, v.1.0, Gold-certified building.
Phase 1 B-4 to B-1, and P1 to P5. Technical and mechanical work for phase 1 was carried out in the D Block, consisting of rooms for medical consultations, medical examinations, minor surgery and MRI scans, as well as parking areas.
Installation of a new 71 tons amonia refrigeration system. Low amount of amonia for a total 168 lbs.