

Complete renewal of the air conditioning systems, including the installation of controls that provide a level of comfort more suitable for building operations.
Complete overhaul of the 150 tons refrigeration room that includes a energy recuperation system. This is a CO2 transcritic refrigeration system.
Replacement of the building’s cooling towers. Air-lifted into place by a helicopter fitted out specifically for this type of work.