sectors : Offices
  • The work will last for more than 18 months
  • Scale of the work is more than $7 000 000.00
  • Montreal, Quebec
    • High end building with an air conditioning system featuring the latest technologies
    • Under floor ventilation throughout the offices

other Projects

MUHC - McGill University Health Center

Hospital consisting of more than one building, for a total of 10 storeys, requiring the installation of high-performance HVAC (heating, ventilation and air conditioning) systems, with high levels of filtration, allowing air to be treated up to a 100%

Marcel-Larocque Arena

Complete overhaul of the 150 tons refrigeration room that includes a energy recuperation system. This is a CO2 transcritic refrigeration system.

Vidéotron Beaubien

Installation of 63 Liebert evaporators for the new high-density server rooms.

Facebook
LinkedIn