sectors : Offices
  • The work will last for more than 18 months
  • Scale of the work is more than $7 000 000.00
  • Montreal, Quebec
    • High end building with an air conditioning system featuring the latest technologies
    • Under floor ventilation throughout the offices

other Projects

Complexe DesJardins

Replacement of the building’s cooling towers. Air-lifted into place by a helicopter fitted out specifically for this type of work.

CHUM - University of Montreal Hospital Centre

Phase 1 B-4 to B-1, and P1 to P5. Technical and mechanical work for phase 1 was carried out in the D Block, consisting of rooms for medical consultations, medical examinations, minor surgery and MRI scans, as well as parking areas.

Major agrifood corporation

New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.