New installation of several ventilation systems for the entire building. LEED-NC, v.1.0, Gold-certified building.
Replacement of the building’s cooling towers. Air-lifted into place by a helicopter fitted out specifically for this type of work.
Installation of a redundant 400 tons refrigeration unit.