sectors : Institutional
  • The work will last for 6 months
  • Scale of the work is more than $1 400 000.00
  • Montreal, Quebec
    • Cold room redevelopment
    • Casiloc modernization project
    • Parallel pack

other Projects

Letendre College

Complete installation of an air conditioning system for classrooms.

Pfizer

Full ductwork for R&D labs. C building.

Major agrifood corporation

New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.