sectors : Institutional
  • The work will last for 6 months
  • Scale of the work is more than $1 400 000.00
  • Montreal, Quebec
    • Cold room redevelopment
    • Casiloc modernization project
    • Parallel pack

other Projects

CHUM - University of Montreal Hospital Centre

Phase 1 B-4 to B-1, and P1 to P5. Technical and mechanical work for phase 1 was carried out in the D Block, consisting of rooms for medical consultations, medical examinations, minor surgery and MRI scans, as well as parking areas.

Du Boisé Library

New installation of several ventilation systems for the entire building. LEED-NC, v.1.0, Gold-certified building.

Pfizer

Full ductwork for R&D labs. C building.

Facebook
LinkedIn