sectors : Institutional
  • The work will last for 6 months
  • Scale of the work is more than $1 400 000.00
  • Montreal, Quebec
    • Cold room redevelopment
    • Casiloc modernization project
    • Parallel pack

other Projects

Du Boisé Library

New installation of several ventilation systems for the entire building. LEED-NC, v.1.0, Gold-certified building.

Marcel-Larocque Arena

Complete overhaul of the 150 tons refrigeration room that includes a energy recuperation system. This is a CO2 transcritic refrigeration system.

Stablex

Filtration system and ventilation for an environment that needs to be free of inorganic materials.

Facebook
LinkedIn