sectors : Institutional
  • The work will last for 5 months
  • Scale of the work is more than $350 000.00
  • Laval, Quebec
    • Complete installation of an air conditioning system for classrooms

other Projects

Pfizer

Full ductwork for R&D labs. C building.

Major agrifood corporation

New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.

Pete Morin Arena

Complete overhaul of the 80 tons refrigeration room that includes a energy recuperation system.

Facebook
LinkedIn