sectors : Lab Works
  • The work will last for 4 months
  • Scale of the work is more than $440 000.00
  • Blainville, Quebec
    • Filtration system and ventilation for an environment that needs to be free of inorganic materials
    • Inorganic waste treatment plant
    • Design, supply, and instal of a 65,000 PCM filtration system with 52 inches industrial ducks
    • Also for this customer: multiple ventilation lab projects and specialized disposal systems with PVC, fiberglass or stainless pipes.

other Projects

MUHC - McGill University Health Center

Hospital consisting of more than one building, for a total of 10 storeys, requiring the installation of high-performance HVAC (heating, ventilation and air conditioning) systems, with high levels of filtration, allowing air to be treated up to a 100%

Jean-Coutu Distribution Center

Design and installation of a 12-ton cold room. Complete warehouse ventilation.

CHU Sainte-Justine

Installation of bifurcated axial fans specifically designed for hospital environments.