sectors : Arena
  • The work will last for 6 months
  • Scale of the work is more than $1 000 000.00
  • St-Jean-sur-Richelieu
    • Complete overhaul of the 150 tons refrigeration room that includes a energy recuperation system.
    • This is a CO2 transcritic refrigeration system

other Projects

Letendre College

Complete installation of an air conditioning system for classrooms.

Olymel

Refrigeration for meat freezer.

Du Boisé Library

New installation of several ventilation systems for the entire building. LEED-NC, v.1.0, Gold-certified building.

Facebook
LinkedIn