Vaudreuil–Soulanges Hospital RDC Niv. 2-3 et 11-12
Vaudreuil-Dorion
Ventilation
Execution of ventilation work for Phase 3 of the South Pavilion B, covering the ground floor and levels 2, 3, 10, and 11.
Adaptation of ventilation systems to the sanitary and operational requirements of an active hospital environment.
Ventilation work for hospital units undergoing expansion
Ventilation project carried out as part of Phase 3 of the work in the South Pavilion B, covering the ground floor as well as levels 2, 3, 10, and 11. The interventions aimed to adapt and optimize the ventilation systems to meet the functional and sanitary requirements of an active hospital environment.
Scope of work
The ventilation work was carried out across multiple levels of the pavilion, including clinical areas requiring precise control of air quality and environmental conditions.
Active hospital environment
The interventions were carried out in an operational building, requiring rigorous planning to ensure continuity of activities and compliance with hospital standards.
Hospital ventilation deployed across multiple levels as part of an expansion phase.