Pete Morin Arena

Complete overhaul of the 80 tons refrigeration room that includes a energy recuperation system....

Marcel-Larocque Arena

Complete overhaul of the 150 tons refrigeration room that includes a energy recuperation system. This is a CO2 transcritic refrigeration system....

MUHC – McGill University Health Center

Hospital consisting of more than one building, for a total of 10 storeys, requiring the installation of high-performance HVAC (heating, ventilation and air conditioning) systems, with high levels of filtration, allowing air to be treated up to a 100%...

CHUM – University of Montreal Hospital Centre

Phase 1 B-4 to B-1, and P1 to P5. Technical and mechanical work for phase 1 was carried out in the D Block, consisting of rooms for medical consultations, medical examinations, minor surgery and MRI scans, as well as parking areas....

St-Mary Hospital Center

Installation of a redundant 400 tons refrigeration unit....

Pfizer

Full ductwork for R&D labs. C building....
Facebook
LinkedIn