Hospital consisting of more than one building, for a total of 10 storeys, requiring the installation of high-performance HVAC (heating, ventilation and air conditioning) systems, with high levels of filtration, allowing air to be treated up to a 100%
Complete installation of an air conditioning system for a 50-storey office tower, in addition to an artificial skating rink in the central atrium.
Filtration system and ventilation for an environment that needs to be free of inorganic materials.