Phase 1 B-4 to B-1, and P1 to P5. Technical and mechanical work for phase 1 was carried out in the D Block, consisting of rooms for medical consultations, medical examinations, minor surgery and MRI scans, as well as parking areas.
Installation of 63 Liebert evaporators for the new high-density server rooms.
Complete renewal of the air conditioning systems, including the installation of controls that provide a level of comfort more suitable for building operations.