sectors : Arena
  • The work will last for 6 months
  • Scale of the work is more than $1 000 000.00
  • St-Jean-sur-Richelieu
    • Complete overhaul of the 150 tons refrigeration room that includes a energy recuperation system.
    • This is a CO2 transcritic refrigeration system

other Projects

CHUM - University of Montreal Hospital Centre

Phase 1 B-4 to B-1, and P1 to P5. Technical and mechanical work for phase 1 was carried out in the D Block, consisting of rooms for medical consultations, medical examinations, minor surgery and MRI scans, as well as parking areas.

Jean-Coutu Distribution Center

Design and installation of a 12-ton cold room. Complete warehouse ventilation.

Ahuntsic Arena

Installation of a new 71 tons amonia refrigeration system. Low amount of amonia for a total 168 lbs.

Facebook
LinkedIn