sectors : Arena
  • The work will last for 6 months
  • Scale of the work is more than $1 000 000.00
  • St-Jean-sur-Richelieu
    • Complete overhaul of the 150 tons refrigeration room that includes a energy recuperation system.
    • This is a CO2 transcritic refrigeration system

other Projects

Major agrifood corporation

New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.

Ahuntsic Arena

Installation of a new 71 tons amonia refrigeration system. Low amount of amonia for a total 168 lbs.