  • The work will last for 6 months
  • Scale of the work is more than $1 000 000.00
  • St-Jean-sur-Richelieu
    • Complete overhaul of the 150 tons refrigeration room that includes a energy recuperation system.
    • This is a CO2 transcritic refrigeration system

other Projects

Federale court

Complete renewal of the air conditioning systems, including the installation of controls that provide a level of comfort more suitable for building operations.

Olymel

Refrigeration for meat freezer.

Major agrifood corporation

New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.