sectors : Arena
  • The work will last for 6 months
  • Scale of the work is more than $1 000 000.00
  • St-Jean-sur-Richelieu
    • Complete overhaul of the 150 tons refrigeration room that includes a energy recuperation system.
    • This is a CO2 transcritic refrigeration system

other Projects

1000 de la gauchetière

Complete installation of an air conditioning system for a 50-storey office tower, in addition to an artificial skating rink in the central atrium.

Pfizer

Full ductwork for R&D labs. C building.

Jean-Coutu Distribution Center

Design and installation of a 12-ton cold room. Complete warehouse ventilation.

Facebook
LinkedIn