sectors : Arena
  • The work will last for 13 months
  • Scale of the work is more than $900 000.00
  • Montreal, Québec
    • Complete overhaul of the 80 tons refrigeration room that includes a energy recuperation system

other Projects

Stablex

Filtration system and ventilation for an environment that needs to be free of inorganic materials.

Du Boisé Library

New installation of several ventilation systems for the entire building. LEED-NC, v.1.0, Gold-certified building.

1000 de la gauchetière

Complete installation of an air conditioning system for a 50-storey office tower, in addition to an artificial skating rink in the central atrium.

Facebook
LinkedIn