sectors : Arena
  • The work will last for 13 months
  • Scale of the work is more than $900 000.00
  • Montreal, Québec
    • Complete overhaul of the 80 tons refrigeration room that includes a energy recuperation system

other Projects

Letendre College

Complete installation of an air conditioning system for classrooms.

Du Boisé Library

New installation of several ventilation systems for the entire building. LEED-NC, v.1.0, Gold-certified building.

Agropur

We added 12.00 tons of refrigeration to preserve the fine cheese inventory.

Facebook
LinkedIn