sectors : Arena
  • The work will last for 13 months
  • Scale of the work is more than $900 000.00
  • Montreal, Québec
    • Complete overhaul of the 80 tons refrigeration room that includes a energy recuperation system

other Projects

CHU Sainte-Justine

Installation of bifurcated axial fans specifically designed for hospital environments.

Vidéotron Beaubien

Installation of 63 Liebert evaporators for the new high-density server rooms.

Major agrifood corporation

New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.

Facebook
LinkedIn