sectors : Institutional
  • The work will last for 6 months
  • Scale of the work is more than $700 000.00
  • Montreal, Quebec
    • Installation of a redundant 400 tons refrigeration units.
    • Challenge : incorporation of a cooler in a very small place located in the mechanical room (required custom engineering plans)
    • A lot of coordination : no period with no air conditioning where tolerated

other Projects

Pete Morin Arena

Complete overhaul of the 80 tons refrigeration room that includes a energy recuperation system.

Complexe DesJardins

Replacement of the building’s cooling towers. Air-lifted into place by a helicopter fitted out specifically for this type of work.

Caisse de dépôt et placement

Prestigious building with an air conditioning system featuring the latest technologies.