sectors : Institutional
  • The work will last for 6 months
  • Scale of the work is more than $700 000.00
  • Montreal, Quebec
    • Installation of a redundant 400 tons refrigeration units.
    • Challenge : incorporation of a cooler in a very small place located in the mechanical room (required custom engineering plans)
    • A lot of coordination : no period with no air conditioning where tolerated

other Projects

CHUM - University of Montreal Hospital Centre

Phase 1 B-4 to B-1, and P1 to P5. Technical and mechanical work for phase 1 was carried out in the D Block, consisting of rooms for medical consultations, medical examinations, minor surgery and MRI scans, as well as parking areas.

Ultima Foods

To increase the yogurt production, we installed additional ammonia compressors.

Letendre College

Complete installation of an air conditioning system for classrooms.