sectors : Institutional
  • The work will last for 6 months
  • Scale of the work is more than $700 000.00
  • Montreal, Quebec
    • Installation of a redundant 400 tons refrigeration units.
    • Challenge : incorporation of a cooler in a very small place located in the mechanical room (required custom engineering plans)
    • A lot of coordination : no period with no air conditioning where tolerated

other Projects

Casino de Montréal

Cold room redevelopment; Casiloc modernization project. Parallel pack.

Caisse de dépôt et placement

Prestigious building with an air conditioning system featuring the latest technologies.

Cummins Diesel

Office air conditioning and carbon monoxide removal.

Facebook
LinkedIn