sectors : Institutional
  • The work will last for 6 months
  • Scale of the work is more than $700 000.00
  • Montreal, Quebec
    • Installation of a redundant 400 tons refrigeration units.
    • Challenge : incorporation of a cooler in a very small place located in the mechanical room (required custom engineering plans)
    • A lot of coordination : no period with no air conditioning where tolerated

other Projects

Jean-Coutu Distribution Center

Design and installation of a 12-ton cold room. Complete warehouse ventilation.

Major agrifood corporation

New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.

Pete Morin Arena

Complete overhaul of the 80 tons refrigeration room that includes a energy recuperation system.

Facebook
LinkedIn