sectors : Institutional
  • The work will last for 3 years
  • Scale of the work is more than $5 000 000.00
  • Montreal, Quebec
    • Phase 1 B-4 to B-1, and P1 to P5
    • Technical and mechanical work for phase 1 was carried out in the D Block, consisting of rooms for medical consultations, medical examinations, minor surgery and MRI scans. The D bloc holds the parking areas as well.
    • D Block – Lot 2N : N3 to N5. These 3 levels include operating rooms, magnetic resonance rooms, angiogram rooms, ultrasound rooms, tomography and offices. 2B The scope of work of Lot 2B is more than $4 000 000.00
    • D Block – Lot 4 : N8 to N10 holds electrophysiology suites, haemodynamics rooms,  injection rooms and coronary care units. The scale of work of Lot 4 is more than $4 000 000.00
    • D Block – Lot 5 : N11 to N19. More than 700 patient rooms on these 9 floors. The scale of work of this project is more than $7 000 000.00.
    • Building A’ : Complete installation of an air conditioning and ventilation system for a building with 10 floors, 3 basement areas and 2 mechanical rooms. This has many types of laboratories, microscope rooms and offices.
    • Installation of many modular units which included 9 exhaust fans with exhaust cones inside the building and BIBO type (Bag-in-Bag-out) filtration units. The scale of work of this project is more than $10 000 000.00.
    • Laboratory NC-3 : located in Building A’, level 6. The work on this part of the project included tight conduct installation ( 0 CFM losses) and BIBO type (Bag-in-Bag-out) filtration units. The scale of work of NC-3 is more than $500 000.00.

other Projects

Pete Morin Arena

Complete overhaul of the 80 tons refrigeration room that includes a energy recuperation system.

Caisse de dépôt et placement

Prestigious building with an air conditioning system featuring the latest technologies.

Letendre College

Complete installation of an air conditioning system for classrooms.