sectors : Institutional
  • The work will last for 3 years
  • Scale of the work is more than $5 000 000.00
  • Montreal, Quebec
    • Phase 1 B-4 to B-1, and P1 to P5
    • Technical and mechanical work for phase 1 was carried out in the D Block, consisting of rooms for medical consultations, medical examinations, minor surgery and MRI scans. The D bloc holds the parking areas as well.
    • D Block – Lot 2N : N3 to N5. These 3 levels include operating rooms, magnetic resonance rooms, angiogram rooms, ultrasound rooms, tomography and offices. 2B The scope of work of Lot 2B is more than $4 000 000.00
    • D Block – Lot 4 : N8 to N10 holds electrophysiology suites, haemodynamics rooms,  injection rooms and coronary care units. The scale of work of Lot 4 is more than $4 000 000.00
    • D Block – Lot 5 : N11 to N19. More than 700 patient rooms on these 9 floors. The scale of work of this project is more than $7 000 000.00.
    • Building A’ : Complete installation of an air conditioning and ventilation system for a building with 10 floors, 3 basement areas and 2 mechanical rooms. This has many types of laboratories, microscope rooms and offices.
    • Installation of many modular units which included 9 exhaust fans with exhaust cones inside the building and BIBO type (Bag-in-Bag-out) filtration units. The scale of work of this project is more than $10 000 000.00.
    • Laboratory NC-3 : located in Building A’, level 6. The work on this part of the project included tight conduct installation ( 0 CFM losses) and BIBO type (Bag-in-Bag-out) filtration units. The scale of work of NC-3 is more than $500 000.00.

other Projects

1000 de la gauchetière

Complete installation of an air conditioning system for a 50-storey office tower, in addition to an artificial skating rink in the central atrium.

Stablex

Filtration system and ventilation for an environment that needs to be free of inorganic materials.

Pfizer

Full ductwork for R&D labs. C building.

Facebook
LinkedIn