sectors : Industrial
  • The work will last for 3 months
  • Scale of the work is more than $85 000.00
  • Pointe-Claire, Quebec
    • Office air conditioning and carbon monoxide removal.

other Projects

Major agrifood corporation

New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.

CHUM - University of Montreal Hospital Centre

Phase 1 B-4 to B-1, and P1 to P5. Technical and mechanical work for phase 1 was carried out in the D Block, consisting of rooms for medical consultations, medical examinations, minor surgery and MRI scans, as well as parking areas.

Stablex

Filtration system and ventilation for an environment that needs to be free of inorganic materials.