sectors : Industrial
  • The work will last for 3 months
  • Scale of the work is more than $85 000.00
  • Pointe-Claire, Quebec
    • Office air conditioning and carbon monoxide removal.

other Projects

Stablex

Filtration system and ventilation for an environment that needs to be free of inorganic materials.

MUHC - McGill University Health Center

Hospital consisting of more than one building, for a total of 10 storeys, requiring the installation of high-performance HVAC (heating, ventilation and air conditioning) systems, with high levels of filtration, allowing air to be treated up to a 100%

Ultima Foods

To increase the yogurt production, we installed additional ammonia compressors.