sectors : Industrial
  • The work will last for 3 months
  • Scale of the work is more than $85 000.00
  • Pointe-Claire, Quebec
    • Office air conditioning and carbon monoxide removal.

other Projects

Pete Morin Arena

Complete overhaul of the 80 tons refrigeration room that includes a energy recuperation system.

CHU Sainte-Justine

Installation of bifurcated axial fans specifically designed for hospital environments.

Major agrifood corporation

New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.

Facebook
LinkedIn