sectors : Industrial
  • The work will last for 3 months
  • Scale of the work is more than $85 000.00
  • Pointe-Claire, Quebec
    • Office air conditioning and carbon monoxide removal.

other Projects

Pete Morin Arena

Complete overhaul of the 80 tons refrigeration room that includes a energy recuperation system.

St-Mary Hospital Center

Installation of a redundant 400 tons refrigeration unit.

Major agrifood corporation

New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.

Facebook
LinkedIn