

New installation of several ventilation systems for the entire building. LEED-NC, v.1.0, Gold-certified building.
Replacement of the building’s cooling towers. Air-lifted into place by a helicopter fitted out specifically for this type of work.
Complete overhaul of the 150 tons refrigeration room that includes a energy recuperation system. This is a CO2 transcritic refrigeration system.