



Replacement of the building’s cooling towers. Air-lifted into place by a helicopter fitted out specifically for this type of work.
Office air conditioning and carbon monoxide removal.
New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.