sectors : Institutional
  • The work will last for 6 months
  • Scale of the work is more than $1 400 000.00
  • Montreal, Quebec
    • Cold room redevelopment
    • Casiloc modernization project
    • Parallel pack

other Projects

MUHC - McGill University Health Center

Hospital consisting of more than one building, for a total of 10 storeys, requiring the installation of high-performance HVAC (heating, ventilation and air conditioning) systems, with high levels of filtration, allowing air to be treated up to a 100%

Du Boisé Library

New installation of several ventilation systems for the entire building. LEED-NC, v.1.0, Gold-certified building.

Pete Morin Arena

Complete overhaul of the 80 tons refrigeration room that includes a energy recuperation system.