sectors : Institutional
  • The work will last for 6 months
  • Scale of the work is more than $1 400 000.00
  • Montreal, Quebec
    • Cold room redevelopment
    • Casiloc modernization project
    • Parallel pack

other Projects

Major agrifood corporation

New warehouse with 384 tons of refrigeration. 40 evaporators with hot gas defrost cool the distribution center. The freezer is maintained at -18C and the rest is at 4 C. The work with a evaporative condenser.

Caisse de dépôt et placement

Prestigious building with an air conditioning system featuring the latest technologies.

Facebook
LinkedIn