sectors : Offices
  • The work will last for more than 18 months
  • Scale of the work is more than $7 000 000.00
  • Montreal, Quebec
    • High end building with an air conditioning system featuring the latest technologies
    • Under floor ventilation throughout the offices

other Projects

Du Boisé Library

New installation of several ventilation systems for the entire building. LEED-NC, v.1.0, Gold-certified building.

Jean-Coutu Distribution Center

Design and installation of a 12-ton cold room. Complete warehouse ventilation.

Marcel-Larocque Arena

Complete overhaul of the 150 tons refrigeration room that includes a energy recuperation system. This is a CO2 transcritic refrigeration system.