New installation of several ventilation systems for the entire building. LEED-NC, v.1.0, Gold-certified building.
Design and installation of a 12-ton cold room. Complete warehouse ventilation.
Complete overhaul of the 150 tons refrigeration room that includes a energy recuperation system. This is a CO2 transcritic refrigeration system.